Sidoarjo is part of the Gerbangkertosusila which is a Metropolitan area, so facilities and infrastructure are needed that are able to support the needs of the city together with the Covid-19 pandemic, it is necessary to revitalize fundamental public transport.According to a survey conducted using the AHP method, the model Y= 0.158X1 + 0.187X2 + 0.135X3 + Caddies 0.

156X4 + 0.126X5 + 0.131X6 + 0.066X7 + 0.042X8.

The calculation results show that the city of Sidoarjo is ready to be developed.The development carried out is to develop the existing transportation route Purabaya Terminal - Porong Terminal into road-based mass transportation, namely medium buses with a capacity of 30 passengers, which has a circulation time of 1 hour 49.25 minutes/trip, with a load factor of 77%, headway 11.55 minutes , and a fleet that requires 12 units of the fleet, as well as the temporary tariff determined according to the BOK of Rp.8.

334,-.The revitalization of existing transportation is by scraping by rerouting existing transportation to be used as feeders, rejuvenating existing transportation, selling it L-Carnosine outside the city, and if it is not roadworthy, old iron scrap is sold using the kiloan method.